Phase II Environmental Site Assessments, Vapor Intrusion Assessments

PM Environmental, Inc. (PM) is experienced in designing and completing Phase II Environmental Site Assessments (ESAs) in accordance with the American Society for Testing and Materials (ASTM) Standard for Environmental Site Assessments: Phase II Environmental Site Assessment Process, State and Federal requirements and customized to meet client needs and budgets. PME has completed thousands of Phase II ESAs at all types of sites and geologic settings and tested for variety of contaminants.

Prior to implementing a Phase II ESA, PM Environmental makes sure to understand the goals of the client and project. The scope of work is designed to meet the scrutiny of the various parties involved including lenders, regulators, attorneys and peers.

PM Environmental owns and operates several Geoprobe® drill rigs and completes its own field services which allows for greater control of scheduling our Phase 2 ESAs and costs.



Site Characterization and Assessment

  • Soil Boring Installation

  • Monitoring Well Installation

  • Vapor Intrusion Assessments

  • Sampling of Soil, Groundwater, Sediments, Surface water, and Air

  • Geophysical Evaluations including Ground Penetrating Radar (GPR)

  • Risk Based Corrective Action (RBCA)

  • Receptor Surveys

  • Contaminant Pathway Evaluations

  • Fate and Transport Evaluations

  • Risk Assessments and Modeling

  • Natural Attenuation and Biodegradation Modeling

  • Quality Assurance/Quality Control

To get in touch with a PM Environmental representative or to learn more about our Phase 2 environmental site assessment process, fill out the form below:

Get a Quote

 

 Related Services: